Wind Analysis

Project12 wind01.JPG

According to the Ecotec and Project Vasari simulation, approximately 60 percent of outer skin areas have a potential to generate energy. Although when considering adjacent buildings, the rate will be decreased, however there are always strong wind in the canal between Rotterdam and RDM, and this will have a positve effect to increase the rate.




Interactive Skin

Project12 sip01.jpg
Project12 sip02.jpg
Project12 sip03.jpg
Project12 sip04.jpg
Project12 sip05.jpg
Project12 sip06.jpg
Project12 sip07.jpg
Project12 sip08.jpg

Interactive skin can react to the speed of wind according to the collected data from sensors. In a grosshopper simulation, five activators are used. The number and depth of morphing elements can be adjustable and this will enable maintaining constant air presure in the space between outer and inner skin.



Project12 skin gh01.jpg

Project12 skin gh02.jpg





Detail


Project12 skin.jpg


Project12 generator.jpg


Project12 truss.jpg


To reinforce a main structure, cross patterned truss system, between inner and outer truss, is adopted






Wave Analysis & Foundation

Final Design

Project12 wave01.jpg


Project12 wave02.jpg

This is a conceptual study to use wave energy on the foundation. In the RDM canal, there are always big ships which pass through. In the onsite observation every ten minutes one or two ships can be seen. Adjacent future transport hub will also be a enormous potential to use wave energy.



Initial Design

Project12 t01.jpg Project12 wave t02.jpg


Project12 wave t03.jpg Project12 wave t04.JPG








Structure System

Project12 con01.jpg
Project12 con02.jpg
Project12 con03.jpg
Project12 con04.jpg
Project12 con05.jpg
Project12 con06.jpg
Project12 con07.jpg
Project12 con08.jpg
Project12 con09.jpg
Project12 con10.jpg
Project12 con11.jpg
Project12 con12.jpg
Project12 con13.jpg
Project12 con14.jpg
Project12 con15.jpg
Project12 con15.jpg
Personal tools