project03:Performance
(→Performance) |
(→Performance) |
||
Line 34: | Line 34: | ||
[[File:project_3week_4_2.jpg|500px]] arch ---- steel | [[File:project_3week_4_2.jpg|500px]] arch ---- steel | ||
− | + | </div> | |
On the left are the different styling elements of this project. On the right shows the flexible part | On the left are the different styling elements of this project. On the right shows the flexible part | ||
Revision as of 21:33, 30 September 2012
Performance
Material Performance
Several references are listed to show the possible materials which can be used in our project.
The accessible roof can be decorated wood and vegetation while the main structure,the column and the "girder" will
be steel.The skin should be metal plates and glasses and perhaps ETFE membrane will be used to let the light in.
On the left are the different styling elements of this project. On the right shows the flexible part
of the roof, which changes its shape by inflation to act as variational landscape and medium for sky light.
The inner space is made of several functional volumes and flowing public realm. The big volumes include
livehouse, indoor sports and exhibition hall. Other small cubes are shops and restaurants. The open public
space could be capable of holding various events, such as rock climbing.
Perspective from the bank
Inner space perspective