project03:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
(Performance)
(Performance)
Line 1: Line 1:
 
== Performance ==
 
== Performance ==
 
'''Material Performance'''
 
'''Material Performance'''
<div style="height:490px; width: 850px; margin:0px; padding: 0px; padding-top: 5px; overflow: hidden;">
+
<div style="height:500px; width: 850px; margin:0px; padding: 0px; padding-top: 5px; overflow: hidden;">
 
<div style="float:left; width: 290px; height 300px; margin-right:20px; border:0px;" align="center">
 
<div style="float:left; width: 290px; height 300px; margin-right:20px; border:0px;" align="center">
 
[[File:project_3_week_9_5.jpg|850px]]
 
[[File:project_3_week_9_5.jpg|850px]]

Revision as of 12:29, 12 November 2012

Performance

Material Performance

Project 3 week 9 5.jpg

Several references are listed to show the possible materials which can be used in our project.

The accessible roof can be decorated wood and vegetation while the main structure,the column and the "girder" will

be steel.The skin should be metal plates and glasses and perhaps ETFE membrane will be used to let the light in.


Structure Performance

Project 3 week 9 3.jpg

Access Performance

plan and top view

Project 3 week 4 7.jpg


north facade

Project 3 week 4 8.jpg


west facade

Project 3 week 4 9.jpg

Project 3 week 5 3.jpg


project layers


Our project is accessible from both water and land.As is showed in the diagram,people can walk freely to the

roof via the ramp on the bank.In addition,the pier will be the connector to both water and other projects,

for there are a few stairs that make the building easier to get from the pier under it.