project09:Performance
From rerdm
(Difference between revisions)
Line 3: | Line 3: | ||
'''Transport ability''' | '''Transport ability''' | ||
+ | |||
+ | 1. Learn from the ship. Departure, arrival and mooring of the ships is the activity with highest frequency of occurrence. The logic of the ship, about size, direction, movement, time, have crucial definition on the geometry of the building. | ||
Line 9: | Line 11: | ||
[[File:project09-Ship_orbit_study.jpg| 900px]] | [[File:project09-Ship_orbit_study.jpg| 900px]] | ||
+ | |||
+ | |||
+ | 2. Enough space for the main entrance and car lane. | ||
+ | |||
+ | |||
+ | '''Functional Circulation''' | ||
+ | |||
+ | ''Structural Performance''' |
Revision as of 21:30, 1 October 2012
The performance of the transport hub is defined by transport ability, functional circulation, and structural performance.
Transport ability
1. Learn from the ship. Departure, arrival and mooring of the ships is the activity with highest frequency of occurrence. The logic of the ship, about size, direction, movement, time, have crucial definition on the geometry of the building.
2. Enough space for the main entrance and car lane.
Functional Circulation
Structural Performance'