project09:Performance

From rerdm
Revision as of 22:36, 19 November 2012 by Wenjia (Talk | contribs)

Jump to: navigation, search

The performance of the transport hub is defined by transport ability, functional circulation, and structural performance.


Transport ability

1. Learn from the ship. Departure, arrival and mooring of the ships is the activity with highest frequency of occurrence. The logic of the ship, about size, direction, movement, time, have crucial definition on the geometry of the building.


Ship orbit study 1-02.jpg


first round study

Project09-Ship orbit study.jpg


second round - adjustment with new form

900px


2.Different "decks" on different levels to adjust to various transport means

water level o.oom / "The island" 0.90m / Yacht 1.80m / Ferry 2.40m / Cruise ferry 1.80&8.10m / Helicopter 13.80m


Project09 concept 1119.jpg


Functional Circulation

Structural Performance

Personal tools