project18:Performance

From rerdm
Revision as of 16:44, 30 September 2012 by Oguzhan (Talk | contribs)

Jump to: navigation, search

Structure

The construction of the waiting hall will be similar to a construction type called monocoque. This technique supports the structural load by using the object's external skin. The technique can also be called the structural skin. A good reference of the usage of this technique is the Porsche pavilion in Wolfsburg, Germany.

In this project they used sheets of stainless steel cladding with welded ribs. These were prefabricated and assembled on site.

Project 18 week 4 reference construction Porsche Pavilion.jpg


Materials

The materialisation of the piers have two options.

1. It can be build in a traditional way with piles and pillars with wooden floor on top of it.

2. Or it can be made with the same technique as the waiting hall.

The usage


Access

It will be a crucial link between these projects, because the experience of going from one project to another will be a continuous experience, rather than experiencing going from function to function.

Project 18 week 4 top elevation.JPG


Reference

1. Porsche Pavilion in Wolfsburg, Germany [1]