project21:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 60: Line 60:
  
  
'''STRUCTURE & MATERIAL:'''  The building's facade is mainly concrete and glazing, for the need of high durability at water center.  It is constructed above an under-water 20-meter deep pile foundation.
+
'''STRUCTURE & MATERIAL:'''  The building's facade is mainly aluminium and glazing, for the need of high durability at water center and maximum rotating flexibility.  It is constructed above an under-water 20-meter deep pile foundation.
  
 
<div style="height:30px; width: 850px; margin:0px; padding: 0px; padding-top: 20px; border: 0px;">
 
<div style="height:30px; width: 850px; margin:0px; padding: 0px; padding-top: 20px; border: 0px;">
 
<div style="float:left; width: 270px; height 30px; border: 1px solid #aaa; margin-right:17px; " align="center">
 
<div style="float:left; width: 270px; height 30px; border: 1px solid #aaa; margin-right:17px; " align="center">

Revision as of 14:22, 19 November 2012

Performance


Thefifthseason elevationN.jpg

Thefifthseason elevationW.jpg

Thefifthseason GFplan.jpg

Thefifthseason 1Fplan.jpg

Thefifthseason 2Fplan.jpg

Thefifthseason structuralplan.jpg

Thefifthseason material.jpg

Thefifthseason facade.jpg


Thefifthseason auditorium1.jpg Thefifthseason auditorium2.jpg Thefifthseason auditorium3.jpg


Thefifthseason skin1.jpg Thefifthseason skin2.jpg Thefifthseason skin3.jpg


The Fifth Season serves two functions - museum and auditorium.


ACCESS: The museum houses a two-floor permanent exhibition on RDM dock, a one-floor temporary exhibition hall. With more than 2000 audience capacity, the auditorium holds lectures, movies and concert events. Circulation is carefully planned to provide smooth access in and out of the building. The SEPAC is connected to the entrance lobby of The Fifth Season for a complete entertainment experience at RDM site.


STRUCTURE & MATERIAL: The building's facade is mainly aluminium and glazing, for the need of high durability at water center and maximum rotating flexibility. It is constructed above an under-water 20-meter deep pile foundation.