project21:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 83: Line 83:
 
</div>
 
</div>
 
<div style="float:left; width: 270px; height 152px; margin-right:20px; border:0px;" align="center">
 
<div style="float:left; width: 270px; height 152px; margin-right:20px; border:0px;" align="center">
[[File:TheFifthSeason_detail_exploded.jpg|270px]]
+
[[File:TheFifthSeason_detail_exploded.gif|270px]]
 
</div>
 
</div>
 
</div>
 
</div>

Revision as of 11:10, 7 January 2013

Contents

Elevation

TheFifthSeason N.jpg

TheFifthSeason W.jpg

Plan

TheFifthSeason UG 1.jpg

TheFifthSeason GF 1.jpg

TheFifthSeason 1F.jpg

TheFifthSeason 2F.jpg

Section

Thefifthseason section long.jpg

Thefifthseason section short1.jpg

Thefifthseason section short2.jpg

Facade

Thefifthseason skin1.jpg

Thefifthseason skin2.jpg

Thefifthseason skin3.jpg


Construction

TheFifthSeason exploded.jpg

TheFifthSeason detail exploded.gif

Auditorium

Thefifthseason auditorium1.jpg

Thefifthseason auditorium2.jpg

Thefifthseason auditorium3.jpg

Access

The Fifth Season serves two functions - museum and auditorium.


ACCESS: The museum houses a two-floor permanent exhibition on RDM dock, a one-floor temporary exhibition hall. With more than 2000 audience capacity, the auditorium holds movies, concert and orchestras. Circulation is carefully planned to provide smooth access in and out of the building. The SEPAC is connected to the entrance lobby of The Fifth Season for a complete passive and active entertainment routine at RDM site.


STRUCTURE & MATERIAL: The building's facade is mainly aluminium and glazing, for the need of high durability at water center and maximum rotating flexibility. It is constructed above an under-water 20-meter deep pile foundation.

Personal tools