project27:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 4: Line 4:
 
[[File:OH perf Axonometric view unit.jpg| 900px]]
 
[[File:OH perf Axonometric view unit.jpg| 900px]]
 
[[File:OH perf Floor Plan -1 unit.jpg| 400px]][[File:OH perf Floor Plan 0 unit.jpg| 400px]]
 
[[File:OH perf Floor Plan -1 unit.jpg| 400px]][[File:OH perf Floor Plan 0 unit.jpg| 400px]]
[[File:OH perf SectionAA unit.jpg]][[File:OH perf Sectionbb unit.jpg| 450px]]
+
[[File:OH perf SectionAA unit.jpg| 400px]][[File:OH perf SectionBB unit.jpg| 400px]]
  
 
==Structure==
 
==Structure==

Revision as of 23:49, 18 January 2013

Contents

Activities in Open House

In the Open House project, the main housing activities are divided into two spaces: the lower floor and the Playroom. Where the lower floor houses the hygiene and storing, students can do the rest in the upper floor space. This space will be partly shared by the students' 3 neighbors.

OH perf Axonometric view unit.jpg OH perf Floor Plan -1 unit.jpgOH perf Floor Plan 0 unit.jpg OH perf SectionAA unit.jpgOH perf SectionBB unit.jpg

Structure

Main structural Logig The construction of Open House mainly exists out of attached pixel components.


Variants on the interaction

900px Multiple floors variant A: one floor of boxes per floor


900px Multiple floors variant B: one body of boxes per floor


900px Multiple floors variant C: foldable walls


900px Multiple floors variant D: elevator units


900px Single floor variant A: self supporting


900px Single floor variant B: external support


900px

OpenHouse OpenSpace VariantC.jpg Older diagram of connected boxes


Model.jpg Older diagram of connected boxes in scenario


Feasibility

Strengths

-Changability of the Open House alignes with a differentiated of space for all students.

-Population students is relatively easy to house in general

-Population students are the first to keep an eye on the street and give the Re-RDM a real city-buzz.

-Project is showcase for the Learn and Play environment - here comes playing and learning together in a sustainable way.

-Project could be built gradually.


Weaknesses

-Never been done application in architecture is of relatively high risk

-High-maintainance

-Components are relatively expensive


Opportunities

Threats