project03:Performance
(→Performance) |
(→Performance) |
||
Line 52: | Line 52: | ||
</div> | </div> | ||
− | The main steel structure formed up by triangular truss allows the | + | The main steel structure formed up by steel vaults and triangular truss allows the inner space to be column free, |
+ | |||
+ | which also brings benefits for arranging spaces for different kinds of functions and making combination and | ||
+ | |||
+ | juxtaposition in the middle. | ||
'''Access Performance''' | '''Access Performance''' |
Revision as of 17:36, 19 November 2012
Performance
Performance
Material Performance
Several references are listed to show the possible materials which can be used in our project.
The accessible roof can be decorated wood and vegetation while the main structure,the truss and the "girder" will
be steel.The skin should be metal plates and glasses and perhaps ETFE membrane will be used to let the light in.
Reference of pixel architectural landscape from Internet
Structure Performance
The main steel structure formed up by steel vaults and triangular truss allows the inner space to be column free,
which also brings benefits for arranging spaces for different kinds of functions and making combination and
juxtaposition in the middle.
Access Performance
top view
north facade west facadeThe swallow-tail like part of the roof provides access from different places on the bank, especially one
on the west acting as connection to other projects. As a result, part of this project gains its place in
the whole context.
project layers
Our project is accessible from both water and land.As is showed in the diagram,people can walk freely to the
roof via the ramp on the bank and so are the paths to the inside of the building.
In addition,the pier will be the connector to both water and other projects,for there are a few stairs that
make the building easier to get from the pier under it.