project03:Performance
From rerdm
(Difference between revisions)
(→Project layers) |
(→Construction) |
||
Line 94: | Line 94: | ||
[[File:project_3_week_11_2.jpg|820px]] | [[File:project_3_week_11_2.jpg|820px]] | ||
+ | |||
+ | Conceptual sketches | ||
[[File:detail.jpg|820px]] | [[File:detail.jpg|820px]] | ||
Line 103: | Line 105: | ||
The interactive skin component is placed on a rail which can be the drainage duct and drove by driving system beneath it via axis and wheels. | The interactive skin component is placed on a rail which can be the drainage duct and drove by driving system beneath it via axis and wheels. | ||
We design two status for each skin component, lock and unlock. When the component moves to the supposed position, the baking system will be activated and lock the wheel.And the video shows how it works. | We design two status for each skin component, lock and unlock. When the component moves to the supposed position, the baking system will be activated and lock the wheel.And the video shows how it works. | ||
+ | |||
== '''Access''' == | == '''Access''' == | ||
Revision as of 21:33, 17 January 2013
Performance
Contents |
Project layers
From inside to outside, the building is composed by floor panels, column free space truss structure, a layer of translucent glass skin, and the outer interactive skin. The whole volume is supported by columns to achieve the floating effect.
Plan and section
Structure
The inner perspective shows the structure styling of the project. Steel truss are involved to fulfill the hope of column free space.
Skin
Plan showing arrangement of functions
Top view showing vertical connection zone and public path