project03:Performance

From rerdm
Revision as of 21:36, 17 January 2013 by Shu (Talk | contribs)

Jump to: navigation, search


Performance


Contents

Project layers

Project 3 final perf 1.jpg

From inside to outside, the building is composed by floor panels, column free space truss structure, a layer of translucent glass skin, and the outer interactive skin. The whole volume is supported by columns to achieve the floating effect.

Plan and section

Plan.jpg


Sec1.jpg

Sec2.jpg

Structure

Project 3 final perf 2.jpg


Project 3 final perf 3.jpg

Skin

Plan showing arrangement of functions

Project 3 final perf 4.jpg Project 3 final perf 5.jpg Project 3 final perf 6.jpg Project 3 final perf 7.jpg

Top view showing vertical connection zone and public path

Project 3 final perf 8.jpg


Project 3 final perf 9.jpg


Project 3 final render 7.jpg Project 3 final render 9.jpg


Project 3 final render 8.jpg Project 3 final render 10.jpg

Construction

section

Project 3 final perf 10.jpg Project 3 final perf 11.jpg Project 3 final perf 12.jpg

Material reference

Material.jpg

Several kind of materials and techniques are involved to construct the interactive skin, including green roof, GRC panel, wood walking path and pixelized roof panel components offer diverse experiences of landscape.



Project 3 week 11 2.jpg

Conceptual sketches

Detail.jpg

Detail section

Compsing.jpg

The interactive skin component is placed on a rail which can be the drainage duct and drove by driving system beneath it via axis and wheels. We design two status for each skin component, lock and unlock. When the component moves to the supposed position, the baking system will be activated and lock the wheel.And the video shows how it works.

Access

Access 3.jpg

The diagram shows by what means the visitors can get access to our project from both the bank and the pier and how can they enter the building from the roof.

Personal tools