From rerdm
(Difference between revisions)
|
|
Line 35: |
Line 35: |
| ==Summary== | | ==Summary== |
| | | |
− | As all projects are being work on under a tight scheduel, we can expect the busy and glorious scene at this port. | + | As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port. |
| | | |
| After getting through all interactions his week, we have decided to set a multifunctional transport hub here, aiming not only to providing the campus with good infrastructural quality, aslo serving all our fellow projects. | | After getting through all interactions his week, we have decided to set a multifunctional transport hub here, aiming not only to providing the campus with good infrastructural quality, aslo serving all our fellow projects. |
Revision as of 00:12, 17 September 2012
Transport Hub
author(s):Wenjia Wang, Yuxiao
Summary
As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port.
After getting through all interactions his week, we have decided to set a multifunctional transport hub here, aiming not only to providing the campus with good infrastructural quality, aslo serving all our fellow projects.
We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method.
In organising multiple flows of this Transportation building, the abandoned pier will be revived to play an important role in our design. It could be fixed and become passenger passge, corporating with new structure and space
Connections
01NAME, 02NAME
<comments/>