project09:Frontpage

From rerdm
(Difference between revisions)
Jump to: navigation, search
(Summary)
(Summary)
Line 37: Line 37:
 
As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port.
 
As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port.
  
After getting through all interactions his week, we have decided to set a multifunctional transport hub here, aiming not only to providing the campus with good infrastructural quality, aslo serving all our fellow projects.  
+
After getting through all interactions this week, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, aslo serving all our fellow projects.  
  
 
We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method.
 
We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method.
  
In organising multiple flows of this Transportation building, the abandoned pier will be revived to play an important role in our design. It could be fixed and become passenger passge, corporating with new structure and space
+
In organising multiple flows of this transportation building, the abandoned pier will be revived to play an important role in our design. It could be fixed and become passenger passge, corporating with new structure and space.
  
 
==Connections==
 
==Connections==

Revision as of 00:14, 17 September 2012

Cover.jpg

Transport Hub

author(s):Wenjia Wang, Yuxiao

Summary

As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port.

After getting through all interactions this week, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, aslo serving all our fellow projects.

We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method.

In organising multiple flows of this transportation building, the abandoned pier will be revived to play an important role in our design. It could be fixed and become passenger passge, corporating with new structure and space.

Connections

01NAME, 02NAME

Modeconcept.jpg

Sketch1.JPG

Sketch2.JPG

Diversification strategy.JPG

Sharing strategy.JPG


<comments/>

Personal tools