project09:Frontpage
From rerdm
(Difference between revisions)
(→Summary) |
(→Summary) |
||
Line 35: | Line 35: | ||
==Summary== | ==Summary== | ||
− | As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port. | + | As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port. After getting through all interactions this week, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, aslo serving all our fellow projects. |
− | + | ||
− | After getting through all interactions this week, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, aslo serving all our fellow projects. | + | |
We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method. | We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method. |
Revision as of 00:53, 17 September 2012
<comments/>