project09:Frontpage

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 35: Line 35:
 
==Summary==
 
==Summary==
  
As all projects are being worked on under a tight scheduel, we can expect the busy and glorious scene at this port. After getting through all interactions this week, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, aslo serving all our fellow projects.  
+
As all projects are being worked on under a tight schedule, we can expect the busy and glorious scene at this port. After getting through all interactions study, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, also serving all our fellow projects.  
  
We've programmed all functional units in our building acorrding to the specific needs of this area. In a further step, we chose a linearly spiral mode rather conventional method.
+
We've programmed all the transport activities, including timetable and the number of passengers, according to the specific needs of this area. Different transports and passengers arrive at the hub on various levels. The whole hub should be an integral space and system without unidirectional flow or restricted functional unit. In a further step, the circulation system involves linearly spiraling ramp system and closed loops. And even though the activities are tentatively planed for the situation from now to 15 years in the future, the building should allow for altering and upgrading.
  
In organising multiple flows of this transportation building, the abandoned pier will be revived to play an important role in our design. It could be fixed and become passenger passge, corporating with new structure and space.
+
After the second round design, we have confirmed the hub will locate at the north edge of the site, just outside the shoreline. Ferry, yacht, cruise ferry, the "island", helicopter, bike, pedestrian reach the hub on different levels. The hub connects directly to "Continuality" to the south and uses this landscape as land connection. At last the problem will fall into the coordination between levels, flows and how the structure and space can cooperate with them.
  
 
==Connections==
 
==Connections==
[[project01:frontpage|01NAME]], [[project02:frontpage|02NAME]]
+
[[project18:frontpage|Continuality]], [[project23:frontpage|Islands]]
  
 
</div>
 
</div>

Revision as of 04:46, 20 November 2012

Project09 concept 1119.jpg

Transport Hub

author(s):Wenjia Wang, Yuxiao

Summary

As all projects are being worked on under a tight schedule, we can expect the busy and glorious scene at this port. After getting through all interactions study, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, also serving all our fellow projects.

We've programmed all the transport activities, including timetable and the number of passengers, according to the specific needs of this area. Different transports and passengers arrive at the hub on various levels. The whole hub should be an integral space and system without unidirectional flow or restricted functional unit. In a further step, the circulation system involves linearly spiraling ramp system and closed loops. And even though the activities are tentatively planed for the situation from now to 15 years in the future, the building should allow for altering and upgrading.

After the second round design, we have confirmed the hub will locate at the north edge of the site, just outside the shoreline. Ferry, yacht, cruise ferry, the "island", helicopter, bike, pedestrian reach the hub on different levels. The hub connects directly to "Continuality" to the south and uses this landscape as land connection. At last the problem will fall into the coordination between levels, flows and how the structure and space can cooperate with them.

Connections

Continuality, Islands

Project09-Mapping02.jpg

Project09-Time and ship.jpg

1A.jpg

6A.jpg

10A.jpg

B.jpg

C2.jpg

Error creating thumbnail: Invalid thumbnail parameters

<comments/>

Personal tools