project09:Frontpage

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 35: Line 35:
 
==Summary==
 
==Summary==
  
As all projects are being worked on under a tight schedule, we can expect the busy and glorious scene at this port. After getting through all interactions study, we have decided to set a multifunctional transport hub here, aiming not only to provide the campus with good infrastructural quality, also serving all our fellow projects.  
+
When involving Area Development, construction of transportation infrastructure has always been the first step.
 +
This multifunctional transport hub, which acts as the interface of the harbor towards the city, aiming not only to provide the campus with good infrastructural quality, also serving all our fellow projects. Located at the northern edge of the port, it has direct connection to the shipping line and physical connections to the landscaping project "Continuality". For inner-port transport, the hub has a dock on the south for the "Islands".
  
 
We've programmed all the transport activities, including timetable and the number of passengers, according to the specific needs of this area. Different transports and passengers arrive at the hub on various levels. The whole hub should be an integral space and system without unidirectional flow or restricted functional unit. In a further step, the circulation system involves linearly spiraling ramp system and closed loops. And even though the activities are tentatively planed for the situation from now to 15 years in the future, the building should allow for altering and upgrading.
 
We've programmed all the transport activities, including timetable and the number of passengers, according to the specific needs of this area. Different transports and passengers arrive at the hub on various levels. The whole hub should be an integral space and system without unidirectional flow or restricted functional unit. In a further step, the circulation system involves linearly spiraling ramp system and closed loops. And even though the activities are tentatively planed for the situation from now to 15 years in the future, the building should allow for altering and upgrading.

Revision as of 18:48, 16 December 2012

F1a.jpg

Transport Hub

author(s):Wenjia Wang, Yuxiao

Summary

When involving Area Development, construction of transportation infrastructure has always been the first step. This multifunctional transport hub, which acts as the interface of the harbor towards the city, aiming not only to provide the campus with good infrastructural quality, also serving all our fellow projects. Located at the northern edge of the port, it has direct connection to the shipping line and physical connections to the landscaping project "Continuality". For inner-port transport, the hub has a dock on the south for the "Islands".

We've programmed all the transport activities, including timetable and the number of passengers, according to the specific needs of this area. Different transports and passengers arrive at the hub on various levels. The whole hub should be an integral space and system without unidirectional flow or restricted functional unit. In a further step, the circulation system involves linearly spiraling ramp system and closed loops. And even though the activities are tentatively planed for the situation from now to 15 years in the future, the building should allow for altering and upgrading.

After the second round design, we have confirmed the hub will locate at the north edge of the site, just outside the shoreline. Ferry, yacht, cruise ferry, the "island", helicopter, bike, pedestrian reach the hub on different levels. The hub connects directly to "Continuality" to the south and uses this landscape as land connection. At last the problem will fall into the coordination between levels, flows and how the structure and space can cooperate with them.

Connections

Continuality, Islands

Project09-Mapping02.jpg

Project09-Time and ship.jpg

F1.jpg

F2.jpg

F3.jpg

F4.jpg

F5.jpg

F6.jpg

B.jpg

C2.jpg

Error creating thumbnail: Invalid thumbnail parameters

<comments/>

Personal tools