project09:Interactions
Interactions between
Project-project(s)
Connection from Project11 (Food CentRDM)
- As an example of projects in needs of material distribution, which can be organized in program as a certain section of operation
- Passengers and freight traffic growth with the develop of 37 projects
Other possibilities: Project 8(SEPAC), Project 21(The fifth season)
- The hub will be standing for connections from other public projects to create diverse route and action on site
Project-building(s)
Connection to Dock Office
Project-object(s)
Connection to Rotterdam Heijplaat shipping line
- As the Transportation Hub, this project should be connected directly and physically to the shipping line
Connection to the village Heijplaat
- The Transportation Hub will assume the doorway of the village
Connection to passageway from harbour to village
- The direction pedestrians come from
Connection to derelict Pier
- The Pier could be re-used as part of the construction in the proposal
Project-person(s)
Connection to Vincent(engineering staff)
- A engineering staff lives in Rotterdam Central. He pointed out beside a lack of commercial and entertainment functions, transportation remains as a big problem. This implies the local needs and potentials for a transportation hub.