project09:Performance
Line 29: | Line 29: | ||
[[File:project09-Ship_orbit_study.jpg| 900px]] | [[File:project09-Ship_orbit_study.jpg| 900px]] | ||
− | + | Docking plan - adjustment with new form | |
[[File:Project09 Ship orbit study 2-01.jpg| 900px]] | [[File:Project09 Ship orbit study 2-01.jpg| 900px]] | ||
− | |||
− | |||
− | |||
Revision as of 17:54, 16 December 2012
The performance of the transport hub is juged by transport capability, functional circulation, and structural performance.
Transport capability
1. Learn from the ship. Departure, arrival and mooring of the ships is the activity with highest frequency of occurrence. The logic of the ship, about size, direction, movement, time, have crucial definition on the geometry of the building.
Basic form finding: Narrow shape with acute angles is feasible for docking boats.
Docking plan - adjustment with new form
Functional Circulation
Each "deck" support one means of transportation and the public activity combined to it. Most of the functions are put on ground floor and first floor, which are both connected to the landscape on the south. "Decks" on different levels are made into one by a continuous spiraling ramp system, which support cycling and wheelchairs.
Structural Performance