project13:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
Line 18: Line 18:
  
 
</div>
 
</div>
 +
  
 
=Accessibility=
 
=Accessibility=

Revision as of 16:05, 2 October 2012


Accessibility

The routing and place of the project will be defined according to the most important interaction/connection with other projects. Besides that the possible overview from the project over the side will also play an important role. It should have a minimum distance from other projects to guarantee seclusion.

During the 30 day period time should not be an issue. There is no need to hurry. Transport to and from the other projects will mainly be by the island of the Islands Project.

Structure

The structure consists of two parts. The central structure which aims upwards with the auditorium, park and relaxing space. It is like an open space in a forest or the stem of a tree. The surrounding structure is like a forest with a canopy structure as a roof system.

13 STEIGENGA STRUCTURESKETCH.jpg

Materials

Choosing a material includes deciding upon interactive issues. Some materials offer different possibilities in interactivity than other materials.

  • - Concrete;
    • - Strong, eternal, durability. Not influencable.
  • - Wood, dead or alive;
  • - Fabric;
    • - Reacting to wind;
  • - Steel
    • - Viollet-le-duc;
    • - Inspired by gothic churches;
  • - Interactive elements
    • - Materials that can be moved;
    • - Materials that can be adjusted;
    • - Materials that respond differently to different circumstances;
    • - Different levels of interaction based on time scale;
    • - People should be able to add to the building. Add materials. Adjust materials.
  • - Material Characteristics
    • - Floating
    • - Acoustics
    • - Durability
    • - Interactivity
    • - Protection against the elements