project24:Frontpage
From rerdm
(Difference between revisions)
Line 45: | Line 45: | ||
The client of the Public Bath Project is described as the result of a public-private partnership between the Public Authority for Sport and Leisure in Rotterdam and RDM Innovation Dock(comprising entities with know-how in ship-building and underwater construction&research). | The client of the Public Bath Project is described as the result of a public-private partnership between the Public Authority for Sport and Leisure in Rotterdam and RDM Innovation Dock(comprising entities with know-how in ship-building and underwater construction&research). | ||
− | VARIATIONS does not try to fix the "problems" of the site but identifies the remoteness and the degree of specialization of the shipyard as the most important feature-lines for a further design proposal. A possible project-brief demands the design of a new research and leisure water centre in the RDM dock, generically described as RDM Public Bath. | + | VARIATIONS does not try to fix the "problems" of the site but identifies the remoteness and the degree of specialization of the shipyard as the most important feature-lines for a further design proposal. A possible project-brief demands the design of a new research and leisure water centre in the RDM dock, generically described as RDM Public Bath. |
+ | <youtube width="850" height="400">HL1350308164</youtube> | ||
==Connections== | ==Connections== |
Revision as of 17:48, 15 October 2012
<comments/>