project24:Frontpage
From rerdm
(Difference between revisions)
Line 46: | Line 46: | ||
VARIATIONS does not try to fix the "problems" of the site but identifies the remoteness and the degree of specialization of the shipyard as the most important feature-lines for a further design proposal. A possible project-brief demands the design of a new research and leisure water centre in the RDM dock, generically described as RDM Public Bath. | VARIATIONS does not try to fix the "problems" of the site but identifies the remoteness and the degree of specialization of the shipyard as the most important feature-lines for a further design proposal. A possible project-brief demands the design of a new research and leisure water centre in the RDM dock, generically described as RDM Public Bath. | ||
+ | |||
<youtube width="850" height="400">HL1350308164</youtube> | <youtube width="850" height="400">HL1350308164</youtube> | ||
Revision as of 17:48, 15 October 2012
<comments/>