From rerdm
(Difference between revisions)
|
|
Line 35: |
Line 35: |
| ==Summary== | | ==Summary== |
| | | |
− | Autoconstruct is a floating, multi-activity area which is undergoing permanent change. Buildings and landscape are undergoing construction in the floating dock enabling inhabitants to customize their accomodation and surroundings to their ever-changing needs. A democratic (online) platform will give inhabitants the chance to choose the design and function of communal areas and organize cohousing initiatives.
| + | The Floating Theatre is a dynamic stage connected to production facilities on site. The curently obsolete cranes will act as a bridge between the production and performance stages. More practically it could be used for moving heavy stage constructions from the Innovatie Dok to the stage area, as a performance object or a "fly tower". |
− | Because of its modularity the project can grow from investment to investment, reducing the risk of developers and homeowners.
| + | |
− | The project is a critique on the inability of conventional architecture to adapt to changing demands from industry and society.
| + | |
| | | |
| ==Connections== | | ==Connections== |
Revision as of 09:41, 18 September 2012
Floating Theater
author(s):Léon Spikker
Summary
The Floating Theatre is a dynamic stage connected to production facilities on site. The curently obsolete cranes will act as a bridge between the production and performance stages. More practically it could be used for moving heavy stage constructions from the Innovatie Dok to the stage area, as a performance object or a "fly tower".
Connections
01NAME, 02NAME
<comments/>