project08:Performance

From rerdm
(Difference between revisions)
Jump to: navigation, search
(Created page with "==Access== In every day ussage scenario SEPAC is accesed through the Contiunuity project, those two projects are connected with the bridge. [[File:Drawings sepac-04.jpg|600px...")
 
Line 1: Line 1:
 +
<div style="height:30px; width: 850px; margin:0px; padding: 0px; padding-top: 20px; border: 0px;">
 +
 +
<div style="float:left; width: 270px; height 30px; border: 1px solid #aaa; margin-right:17px; " align="center">
 +
[[project08:interactions |'''Interactions''']]
 +
</div>
 +
 +
<div style="float:left; width: 270px; height 30px; border: 1px solid #aaa; margin-right:17px;" align="center">
 +
[[project08:styling |'''Styling''']]
 +
</div>
 +
 +
<div style="float:right; width: 270px; height 30px; border: 1px solid #aaa; " align="center">
 +
[[project08:performance |'''Performance''']]
 +
</div>
 +
 +
</div>
 +
 
==Access==
 
==Access==
 
In every day ussage scenario SEPAC is accesed through the Contiunuity project, those two projects are connected with the bridge.
 
In every day ussage scenario SEPAC is accesed through the Contiunuity project, those two projects are connected with the bridge.

Revision as of 10:10, 13 November 2012

Performance

Access

In every day ussage scenario SEPAC is accesed through the Contiunuity project, those two projects are connected with the bridge.

Drawings sepac-04.jpg

Facade deformation

Drawings sepac-05.jpg

Scheme showing the movement exploded into basic transformations

Additionally to the facade elements, please note the way the egde of the terrace is secured with the dynamic elements.

Drawings sepac-06.jpg

The movement of the bearing members

Drawings sepac-07.jpg

Corelation between the dynamic facade and the media facade