project19:Performance
From rerdm
(Difference between revisions)
Line 101: | Line 101: | ||
− | [[File:project19_Concrete Pontoons 01.1.jpg| | + | [[File:project19_Concrete Pontoons 01.1.jpg|420px|The fixed floating elements of the project (promenades) will integrate existing pontoon techniques into the overall structure. Here precast concrete pontoons are used for a house construction.]] [[File:project19_Steel Pontoons 02.1.jpg|420px|Steel pontoons are another approach as seen here. This also highlights the need to anchor the floating pontoons to the dockside or bed, using foundations that allow the structures to rise and fall with changes in water levels.]] |
==Materials== | ==Materials== |
Revision as of 00:20, 24 January 2013
Contents |
Market Stalls
Construction Sequence (slideshow)
Promenades
01 - Rotating Access Bridges (slideshow)
02 - Tidal Access Ramps (slideshow)
Structure
Framing
Hover over all images for accompanying text
Hub and Anchor Node Foundations
Promenade Buoyancy