project19:Performance

From rerdm
Revision as of 17:41, 24 January 2013 by JD (Talk | contribs)

Jump to: navigation, search


Contents

Market Stalls

Construction Sequence (slideshow)


Project19 Stall Buildup 01.1.jpg
Project19 Stall Buildup 02.1.jpg
Project19 Stall Buildup 03.1.jpg
Project19 Stall Buildup 04.1.jpg
Project19 Stall Buildup 05.1.jpg
Project19 Stall Buildup 06.1.jpg
Project19 Stall Buildup 07.1.jpg
Project19 Stall Buildup 08.1.jpg
Project19 Stall Buildup 09.1.jpg
Project19 Stall Buildup 10.1.jpg
Project19 Stall Buildup 11.1.jpg
Project19 Stall Buildup 12.1.jpg
Project19 Stall Buildup 13.1.jpg
Project19 Stall Buildup 14.1.jpg
Project19 Stall Buildup 15.1.jpg
Project19 Stall Buildup 16.1.jpg


Promenades

01 - Rotating Access Bridges (slideshow)


To enable movement through the market by stalls and other boats, there are four rotating bridges located on key promenades (see plans) - here a recently refurbished market stall departs the dock adjacent to the Innovation Dock building.


Project19 Bridge Opening 01.jpg
Project19 Bridge Opening 02.jpg
Project19 Bridge Opening 03.jpg
Project19 Bridge Opening 04.jpg
Project19 Bridge Opening 05.jpg
Project19 Bridge Opening 06.jpg


02 - Tidal Access Ramps (slideshow)


Project19 Tidal 01.1.jpg
Project19 Tidal 02.1.jpg
Project19 Tidal 03.1.jpg
Project19 Tidal 02.1.jpg


Structural Approaches

Framing

Hover over all images for accompanying text

Example of aluminium space frame, here used to construct an Antarctic research station. As shown above, this approach is used to frame the market stalls.

Internal cells within an aluminium hulled boat - the stall construction utilises

The interlinked timber frame here provides a strong yet relatively lightweight superstructure.


Hub and Anchor Node Foundations


Spencer Dock Bridge, 2009, Amanda Levete Architects. This road bridge uses sculptural concrete piers to anchor to the bed of the dock, highlighting that aesthetics apply to even the base elements. The project can borrow foundation techniques developed for the offshore turbine industry, including piled and gravity approaches.


Promenade Buoyancy


The fixed floating elements of the project (promenades) will integrate existing pontoon techniques into the overall structure. Here precast concrete pontoons are used for a house construction. Steel pontoons are another approach as seen here. This also highlights the need to anchor the floating pontoons to the dockside or bed, using foundations that allow the structures to rise and fall with changes in water levels.

Materials